Yes, plan on it. If you expand your parking lot in Palmer Lake, CO, expect the Town of Palmer Lake to review the project before new asphalt goes down, and the Pikes Peak Regional Building Department (PPRBD) after that. The Town's land use pages say a local application comes first, and plans go to PPRBD once the Town has approved them and been paid.
What the review covers depends on how much pavement you add, whether you open a new entrance onto Highway 105 or a side street, and where the runoff goes. Paperwork moves faster when the site work is planned before you file. Paul's Asphalt handles that side of asphalt parking lot expansion in Palmer Lake: grading, base, drainage, paving and striping, scoped so your drawings match what gets built. Below you will find the approval order, the Town's fee lines, drainage, layout and a checklist for your first meeting.
Permits and Approvals a Palmer Lake Parking Lot Expansion Needs
A parking lot expansion in Palmer Lake goes through the Town's land use process first. For a development proposal, the Town asks for a letter of intent and a meeting with the Town Administrator/Clerk. Every application needs one electronic submittal plus one set of full drawings for the Administration office file.
The Town also retains consultants, including engineers and inspectors, to evaluate development and land use applications. Drawings that show grades and drainage give those reviewers what they need.
The same path applies to every kind of property. A shop on Highway 105, which runs through town, a school lot in Lewis-Palmer School District 38, or a community building near the Tri-Lakes Center for the Arts or Estemere all start at the Town office, 42 Valley Crescent. Questions about a specific application go to the Town office at 719-481-2953.
Does the Town or the Regional Building Department Come First in Palmer Lake?
The Town comes first in Palmer Lake. Its Land Use Applications page says the local application must be submitted before approvals from PPRBD, and that you contact the Town for final approval when you request a final inspection with PPRBD.
PPRBD serves Palmer Lake, Monument and El Paso County from its main office at 2880 International Circle in Colorado Springs (719-327-2880). Its list of work exempt from permits includes private driveways supported directly on grade. That list covers building permits only and says nothing about zoning or land use, so it does not answer the Town's question.
What the Town of Palmer Lake Charges to Review a Commercial Site Plan
The Town of Palmer Lake's fee schedule, updated September 24, 2026, lists several lines a commercial site plan may touch, and land use application fees carry an applicable 2% use tax. The schedule does not say which lines a parking lot expansion triggers. The Town decides that for your lot, so treat the table as a list of what may come up.
| Fee line on the Town schedule | Amount listed | Note |
|---|---|---|
| Pre-application meeting | $0 | First talk about your plan |
| Site development plan review, non-residential | $750.00 | Ch 17.12 |
| Plan review estimated by the Development Review Team | $500.00 and up | Consultant review |
| Stormwater | $250.00 | Ch 17.68 |
| Drainage | Set by formula | Per application |
| Driveway / street cut permit (right of way) | $200.00 | New access to a street |
| Street construction permit | $500.00 | Ch 12.04 |
| Fire services plan review | $500.00 under 10 acres, $750.00 over | Development plans |
- If you are adding a new entrance, then ask about the street cut line and which agency controls the entrance, especially on Highway 105, a state highway that meets I-25 at Exit 161 in Monument.
- If you are adding a whole new section, then expect drainage and stormwater questions, and have Paul's Asphalt scope the grading before you file.
- If you are adding a few stalls, then ask the Town which lines apply and book a site visit with us so the plan matches the work.
Fees change, so confirm current amounts at 719-481-2953.
How a Bigger Paved Area Changes Drainage Review in Palmer Lake
A bigger paved area in Palmer Lake gets its own drainage look because the Town's storm sewer is state regulated. The Colorado Department of Public Health and Environment regulates the Town's stormwater discharges through an MS4 permit (certification COR090114), and the Town's program began in 2021.
Palmer Lake sits at 7,139 feet on the Palmer Divide, the ridge that splits the Arkansas River drainage to the south from the Platte River drainage to the north. Sites near the Greenland Open Space Preserve to the north or Pike National Forest to the west often have slopes to manage. Water left standing on asphalt at this elevation freezes and thaws all winter.
Paul's Asphalt offers water drainage work, asphalt drainage solutions and grading and prep, so the drainage plan and the crew that builds it come from one place.
How Is New Asphalt Tied Into the Existing Lot So Water Still Drains?
New asphalt is tied into an existing Palmer Lake lot by grading the new area to carry water the same way as the old one, then joining the two surfaces at a clean edge. The seam needs care, because water collects at any low spot or gap. We handle excavation, grading, gravel base and surface preparation, then pave the new section against the old so the lot sheds water as one surface.
Accessibility and Layout Requirements for Added Stalls in Palmer Lake
Added stalls in Palmer Lake can bring accessibility and layout questions, because an expansion changes your space count and the route from parked cars to the door. Plan accessible spaces, access aisles and that route into the layout from the start.
Paul's Asphalt offers ADA parking lot compliance and parking lot striping. The stall count, accessible spaces and traffic flow you show the Town should be the same layout we stripe at the end. That applies to a church lot, a school lot or a community building like the library branch at 66 Lower Glenway.
What to Bring to the First Palmer Lake Town Office Meeting and What to Expect on Timing
Bring enough detail to the first meeting at the Palmer Lake Town office that the Town can tell you which reviews apply:
- The property address, and confirmation that it sits inside town limits.
- The rough size of the addition and where it goes.
- A sketch of the new layout with stall count and accessible spaces.
- Arrows showing which way water drains now and after the work.
- Any new entrance, and which street it opens onto.
- Your letter of intent, if the Town treats the project as a development proposal.
- The PPRBD contact (719-327-2880) for the second stage.
We found no published approval timeline for Palmer Lake, so ask the Town for an estimate at that meeting and book your paving estimate early. Paving season at this elevation winds down in the fall, and a plan approved late in the year may wait for spring weather. For what happens once crews arrive, see how long asphalt parking lot paving takes in Palmer Lake.
Why Have Paul's Asphalt Handle the Site Work for a Palmer Lake Expansion
Paul's Asphalt is based at 702 Highway 105 in Palmer Lake and has served the town and surrounding communities for 10 years, with an A+ BBB rating. The business is locally owned, and Paul works on the jobs himself.
One crew covers the site side of an expansion: excavation, grading, gravel base, drainage, hot mix asphalt paving, striping and ADA compliance. Our phone line is open 24 hours, consultations are free, and reviewers describe a reply the next day.
"I had a difficult driveway to pave due to varying slope and Paul and his crew did a great job," wrote Marcus G. Customers rate us 4.8 stars on Google, reviews mention work in Chaparral Hills, and we serve Monument, Black Forest and the rest of El Paso County.
The Bottom Line
Plan on needing approval to expand a parking lot in Palmer Lake. The Town of Palmer Lake reviews it first, with a letter of intent, a meeting and full drawings, and PPRBD comes second. The fee schedule lists lines for non-residential site plan review, stormwater, drainage and street cuts, and the Town decides which apply to your lot. A clear plan for grading, drainage and layout keeps that review moving. Call Paul's Asphalt at (719) 232-1523 for a free consultation, and we will scope your expansion so the application and the new pavement match.